BUPA CROMWELL HOSPITAL LONDON, UK
BACKGROUND
Howorth Air Technology Ltd were selected by the BUPA Cromwell Hospital to redevelop a floor within their flagship hospital to create a dedicated Adult Intensive Care Recovery Suite. MIDDAS supported Howorth and their professional team through concept and detailed design, installation and commissioning.
BRIEF
Howorth required a modular partition system that was manufactured off site and delivered ready to install. The system needed to integrate with their specialist equipment and services installation while achieving the HTM specifications and fire rating required for the facility. To add a further design dimension, BUPA also wanted to incorporate switchable smart glass throughout the facility for enhanced patient privacy.
SOLUTION
The proven M100 bi-panel and mono-bloc partition system was selected after MIDDAS were able to demonstrate conformity to the hygienic, acoustic, structural and fire rating requirements. The M100 framework is designed to allow services to be routed through it, and to support the secondary equipment supplied by Howorth.
The flush glazing and door sets with integrated smart glass were installed throughout the facility, in both fire rated and non-fire rated specification, to achieve the high levels of patient privacy required by BUPA and their clients.
Download File
July 2022 | 581.59 KB
“We have been an advocate of offsite modular construction for healthcare facilities for a long time and the BUPA Cromwell project was perfect showcase of the benefits, resulting in a world class facility. MIDDAS worked closely with our delivery teams and partners to ensure a fully co ordinated solution and provided bespoke products required for this complex project.”